1 |
DELLAERT N , JEUNET J , JONARD N . A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs[J]. International Journal of Production Economics, 2000, 68 (3): 241- 257.
doi: 10.1016/S0925-5273(00)00084-0
|
2 |
YOU M , XIAO Y Y , ZHANG S Y , et al. Modeling the capacitated multi-level lot-sizing problem under time-varying environments and a fix-and-optimize solution approach[J]. Entropy, 2019, 21 (4): 377.
doi: 10.3390/e21040377
|
3 |
XIAO Y Y , ZHANG R Q , ZHAO Q H , et al. A variable neighborhood search with an effective local search for uncapacitated multilevel lot-sizing problems[J]. European Journal of Operational Research, 2014, 235 (1): 102- 114.
doi: 10.1016/j.ejor.2013.10.025
|
4 |
LOLLI F , MESSORI M , GAMBERINI R , et al. Modelling production cost with the effects of learning and forgetting[J]. IFAC-PapersOnLine, 2016, 49 (12): 503- 508.
doi: 10.1016/j.ifacol.2016.07.672
|
5 |
JABER Y M , PELTOKORPI J . The effects of learning in production and group size on the lot-sizing problem[J]. Applied Mathematical Modelling, 2020, 81, 419- 427.
doi: 10.1016/j.apm.2019.12.026
|
6 |
郭映彤. 研制与批产订单混合调度建模及优化方法研究[D]. 上海: 上海交通大学, 2016.
|
|
GUO Y T. Modeling and optimizing methods research on hybrid scheduling of R&D and batch production[D]. Shanghai: Shanghai Jiao Tong University, 2016.
|
7 |
于雪磊, 瞿华. 基于"龙芯"处理器军用装备产品平台化、产品化研究及实践[J]. 中国航天, 2022, (S1): 62- 66.
|
|
YU X L , QU H . Research and practice of platformisation and productisation of military equipment products based on longchip processor[J]. Aerospace China, 2022, (S1): 62- 66.
|
8 |
张变亚. 多品种多阶段生产系统问题建模优化分析[J]. 兰州石化职业技术学院学报, 2021, 21 (2): 18- 23.
doi: 10.3969/j.issn.1671-4067.2021.02.007
|
|
ZHANG B Y . Modeling optimization analysis of multiple varieties and stages production system problems[J]. Journal of Lanzhou Petrochemical Polytechnic, 2021, 21 (2): 18- 23.
doi: 10.3969/j.issn.1671-4067.2021.02.007
|
9 |
陈洪根, 闫鑫, 张艳, 等. 生产系统维修管理-统计过程控制-经济生产批量集成优化研究综述[J]. 现代制造工程, 2020, (10): 148-155, 12.
|
|
CHEN H G , YAN X , ZHANG Y , et al. Review on the integrated optimization of maintenance management & statistical process control & economic production quantity on production system[J]. Modern Manufacturing Engineering, 2020, (10): 148-155, 12.
|
10 |
王得水, 黄漫玲. 浅析复杂电子信息系统装备产品批产生产线建设[J]. 装备制造技术, 2019, (11): 209- 212.
|
|
WANG D S , HUANG M L . Brief analysis on construction of batch production line of complex electronic information system equipment product[J]. Equipment Manufacturing Technology, 2019, (11): 209- 212.
|
11 |
王中婧. 某军工批产MAO制造项目的进度管理研究[D]. 成都: 电子科技大学, 2018.
|
|
WANG Z J. Study on progress management in a military batch production of the MAO manufacturing project[D]. Chengdu: University of Electronic Science and Technology of China, 2018.
|
12 |
胡楠楠, 南方. 低成本批产商业通信卫星用元器件保障模式探索[J]. 数字通信世界, 2018, (8): 247- 259.
doi: 10.3969/J.ISSN.1672-7274.2018.08.212
|
|
HU N N , NAN F . Exploration of component assurance models for low-cost wholesale production of commercial communications satellites[J]. Digital Communication World, 2018, (8): 247- 259.
doi: 10.3969/J.ISSN.1672-7274.2018.08.212
|
13 |
YU Y , TANG J F , SUN W , et al. Reducing worker(s) by converting assembly line into a pure cell system[J]. International Journal of Production Economics, 2013, 145 (2): 799- 806.
doi: 10.1016/j.ijpe.2013.06.009
|
14 |
KAKU I . Is SERU a sustainable manufacturing system?[J]. Procedia Manufacturing, 2017, 8, 723- 730.
doi: 10.1016/j.promfg.2017.02.093
|
15 |
SUER G , ULUTAS B , KAKU I , et al. Considering product life cycle stages and worker skill level in SERU production systems[J]. Procedia Manufacturing, 2019, 39, 1097- 1103.
doi: 10.1016/j.promfg.2020.01.361
|
16 |
XIE Y , ZHOU S H , XIAO Y Y , et al. A β-accurate linearization method of Euclidean distance for the facility layout problem with heterogeneous distance metrics[J]. European Journal of Operational Research, 2018, 265 (1): 26- 38.
doi: 10.1016/j.ejor.2017.07.052
|
17 |
XIAO Y Y , ZHANG Y , KULTUREL-KONAK S , et al. The aperiodic facility layout problem with time-varying demands and an optimal master-slave solution approach[J]. International Journal of Production Research, 2021, 59 (17): 5216- 5235.
doi: 10.1080/00207543.2020.1775909
|
18 |
YOU M , XIAO Y Y , ZHANG S Y , et al. Optimal mathematical programming for the warehouse location problem with Euclidean distance linearization[J]. Computers & Industrial Engineering, 2019, 136 (C): 70- 79.
|
19 |
XIAO Y Y , YUAN Y Y , ZHANG R Q , et al. Non-permutation flow shop scheduling with order acceptance and weighted tardiness[J]. Applied Mathematics and Computation, 2015, 270 (1): 312- 333.
|
20 |
ZHANG R Q , ZHANG L K , XIAO Y Y , et al. The activity-based aggregate production planning with capacity expansion in manufacturing systems[J]. Computers & Industrial Engineering, 2012, 62 (2): 491- 503.
|
21 |
周宏明, 高顺, 张祥雷, 等. 带缓冲串行生产系统预防性维护建模及运行参数优化研究[J]. 运筹与管理, 2022, 31 (1): 22- 29.
|
|
ZHOU H M , GAO S , ZHANG X L , et al. Preventive maintenance modeling and operation parameter optimization for series production systems with intermediate buffers[J]. Operations Research and Management Science, 2022, 31 (1): 22- 29.
|
22 |
陆志强, 张之磊. 串联生产系统维护在线决策与缓冲分配联合优化[J]. 同济大学学报(自然科学版), 2021, 49 (3): 431- 439.
|
|
LU Z Q , ZHANG Z L . Joint optimization of on-line decisionmaking for maintenance and buffer allocation for serial production system[J]. Journal of Tongji University (Natural Science), 2021, 49 (3): 431- 439.
|
23 |
方鹏, 李芳, 刘凡, 等. 考虑产品质量控制的生产系统预防性维护策略联合优化研究[J]. 上海理工大学学报, 2021, 43 (5): 497- 504.
|
|
FANG P , LI F , LIU F , et al. Optimization of preventive maintenance strategy for production system considering product quality control[J]. Journal of University of Shanghai for Science and Techology, 2021, 43 (5): 497- 504.
|
24 |
ADULYASAK Y , CORDEAU J F , JANS R . The production routing problem: a review of formulations and solution algorithms[J]. Computers & Operations Research, 2015, 55 (1): 141- 152.
|
25 |
CHITSAZ M , CORDEAU J F , JANS R . A branch-and-cut algorithm for an assembly routing problem[J]. European Journal of Operational Research, 2020, 282 (3): 896- 910.
doi: 10.1016/j.ejor.2019.10.007
|
26 |
ALVAREZ A , MIRANDA P , ROHMER S . Production routing for perishable products[J]. Omega, 2022, 111, 102667.
doi: 10.1016/j.omega.2022.102667
|
27 |
FRIFITA S , AFSAR H M , HNAIEN F . An efficient mat-heuristic algorithm for the dynamic disassembly assembly routing problem with returns[J]. European Journal of Industrial Engineering, 2020, 16 (5): 584- 617.
|
28 |
MANOUSAKIS E G , KASAPIDIS G A , KIRANOUDIS C T , et al. An infeasible space exploring matheuristic for the production routing problem[J]. European Journal of Operational Research, 2021, 298 (2): 478- 495.
|
29 |
LI Y T , CHU F , CHU C B , et al. An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing[J]. European Journal of Operational Research, 2019, 272 (3): 914- 927.
doi: 10.1016/j.ejor.2018.07.018
|
30 |
RUSSELL-ROBERT A . Mathematical programming heuristics for the production routing problem[J]. International Journal of Production Economics, 2017, 193, 40- 49.
doi: 10.1016/j.ijpe.2017.06.033
|
31 |
NEVES-MOREIRA F , ALMADA-LOBO B , GUIMARÃES L , et al. The multi-product inventory-routing problem with pickups and deliveries: mitigating fluctuating demand via rolling horizon heuristics[J]. Transportation Research Part E: Logistics and Transportation Review, 2022, 164, 102791.
doi: 10.1016/j.tre.2022.102791
|
32 |
MOONS S , RAMAEKERS K , CARIS A , et al. Integrating production scheduling and vehicle routing decisions at the ope-rational decision level: a review and discussion[J]. Computers & Industrial Engineering, 2017, 104 (2): 224- 245.
|
33 |
HUANG M , DU B G , GUO J . A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows[J]. Computers & Operations Research, 2023, 159, 106346.
|
34 |
SHAMAKI B P , ROUX L G . Optimization for sustainable hydrogen production path[J]. Computer Aided Chemical Engineering, 2022, 51, 235- 240.
|
35 |
ERDOGAN A , GULER M G . Optimization and analysis of a hydrogen supply chain in terms of cost, CO2 emissions, and risk: the case of Turkey[J]. International Journal of Hydrogen Energy, 2023, 48 (60): 22752- 22765.
doi: 10.1016/j.ijhydene.2023.04.300
|
36 |
RIERA J A , LIMA R M , KNIO O M . A review of hydrogen production and supply chain modeling and optimization[J]. International Journal of Hydrogen Energy, 2023, 48 (37): 13731- 13755.
|
37 |
WU J J , ZHANG J , YI W M , et al. Agri-biomass supply chain optimization in north China: model development and application[J]. Energy, 2022, 239 (D): 122374.
|
38 |
DE-JONG S , HOEFNAGELS R , WETTERLUND E , et al. Cost optimization of biofuel production-the impact of scale, integration, transport and supply chain configurations[J]. Applied Energy, 2017, 195 (6): 1055- 1070.
|
39 |
DROFENIK J , PAHOR B , KRAVANJA Z , et al. Multi-objective scenario optimization of the food supply chain—Slovenian case study[J]. Computers & Chemical Engineering, 2023, 172, 108197.
|