[1] Arbabi,Mansur,John A Garate.Interactive real time scheduling and contro[C]//Proc.of the Summer Simulation Conference,Chicago,1985:271-277. [2] Gooley T D.Automating the satellite range scheduling process[D].Ohio:Air Force Institute of Technology Master Thesis,1993. [3] Schalck S M.Automating satellite range scheduling[D].Ohio-.Air Force Institute of Technology,1993. [4] Barbulescu L.Howe A.Whitley D.AFSCN Scheduling:how the problem and solution have evolved[J].Mathematic and Computer Modelling,2006,43:1023-1037. [5] Barbulescu L,Howe A,Watson J P,et al.Satellite range scheduling:a comparison of genetic,heuristic and local search[C]//Seventh International Conference on Parallel Problem-Solving From Nature.Berlin,2002:611-620. [6] Barbulescu L,Watson J P.Whitley D.Scheduling space-ground communications for the air force satellite control network[J].Journal of Scheduling,2004,1(7):7-34. [7] Clement B J,Johnston M D.The deep space network scheduling problem[C]//American Association for Artificial Intelligence,Pittsburgh,2005. [8] Clement B J,Johnston M D.Design of a deep space network scheduling application[C]//Proc.of the International Workshop on Planning and Scheduling for Space,Baltimore,2006. [9] 贺仁杰,谭跃进.基于约束满足的卫星地面站资源优化分配问题研究[J].计算机工程与应用,2004,40(18):229-232. [10] 王远振,赵坚,聂成.多卫星一地面站系统的Petri网模型研究[J].空军工程大学学报(自然科学版),2003.4(2):7-11. [11] 金光,武小悦,高卫斌.卫星地面站资源配置仿真研究[J].系统仿真学报,2004,16(11):2401-2403. [12] 金光,武小悦,高卫斌.卫星地面站资源调度优化模型及启发式算法[J].系统工程与电子技术,2004,26(12):1839-1841.(Jin Guang,Wu Xiaoyue,Gao Weibin.Ground station resource scheduling optimization model and its heuristil algorithm[J].Systems Engineering and Electronics,2004,26(12):1839-1841.) [13] 凌晓冬,陈峰,武小悦.多星测控调度问题综述[J].飞行器测控学报,2008,27(2):1-6. [14] 李云峰,陈祥国,武小悦.卫星数传调度模型研究[J].国防科技大学学报,2007,29(6):121-125. |